1 | After installing one pair of post which component of scaffold should be install | ||||||||||||
A/ Runer B/ Brace C/ Ties D/ Guys | A | ||||||||||||
2 | Prior to install scaffold a scaffold supervisor must look | ||||||||||||
A/ Height of scaffold B/ Width of scaffold C/ Length of scaffold D/ Load rating Scf | D | ||||||||||||
3 | Who will install red tag | ||||||||||||
A/ Scaffold supervisor B/ Scaffold inspector C/ Permit receiver D/ Permit issuer | A | ||||||||||||
4 | What type of rope used to lift scaffold material ( drawing ) | ||||||||||||
A/ Rolling hitch B/ Reaf knot C/ Timber hitch D/ Drum hitch | |||||||||||||
5 | Scaffold plan required | if scaffold height increase more then |
|
mtr | |||||||||
A/ 4.0 mtr | B/ 38.0 mtr C/ 3.0 mtr D/ 12.2 mtr | D | |||||||||||
6 | If yellow tag installed on the scaffold what is to be worn | ||||||||||||
A/ Safety belt B/ Life lice C/ Full body harness anchored D/ Full body harness | C | ||||||||||||
7 | Ladder 1st rung height from the ground | ||||||||||||
A/ 600mm/ 2ft B/ 300mm/1ft C/ 1200mm/ 4ft D/ 1800mm / 6ft | A | ||||||||||||
8 | Scaffold plat form slope | ||||||||||||
A/ 1;3 B / 1;1 C / 1;4 D / 1;2 | C | ||||||||||||
9 | Tread depth of stairway at least | ||||||||||||
A / 220mm B / 150mm C / 300mm D / 400mm | A | ||||||||||||
10 | Mediume duty scaffold underhung maximum longitudinal post spacing | ||||||||||||
A / 1.2 B / 1.8 C / 1.5 D / 3.2 | C | ||||||||||||
11 | OSHA 1926.450 Tank builders bracket scaffold space atleast | ||||||||||||
A / 1.5 B / 3.2 C / 1.2 D / 2.4 | B | ||||||||||||
12 | Check coupler shall be install | ||||||||||||
A/ Bellow the runer B/ Bellow the transom C/On the beam D/Top&Bottom H/ tube | D | ||||||||||||
13 | If yellow tag is install Fullbody harness shall be anchored to | ||||||||||||
A /Conduit B / Steel stucture C / Runner D / Transom | B | ||||||||||||
14 | Above the platform headroom height atleast | ||||||||||||
A / 2.0 M B / 1.5M C / 2.5M D / 1.8M | D | ||||||||||||
15 | An installed power line 60kv scaffold clearance atleast | ||||||||||||
A / 4.0mtr B / 1.0mtr C / 3.0mtr D / 1.2mtr | A | ||||||||||||
16 | Bracket scaffold plank shall be overlaped | ||||||||||||
Plank shall be overlape in one direction only and minimum overlape 230mm ( 9'' ) | |||||||||||||
17 | Medimum duty mobile scaffold caster wheel dia | ||||||||||||
A / 5'' B / 7'' C /4'' D / 3'' | B | ||||||||||||
18 | Mobile tower scaffold caster wheel must have | ||||||||||||
A / Pin B / Base plat C / Wheel lock D / Screw jack | C | ||||||||||||
19 | Landing platform wide atleast | ||||||||||||
A /27'' B / 20'' C / 15'' D / 21'' | A | ||||||||||||
20 | 1!/2 thick plank span length increase 1.5 mtr how many board bearer atleast | ||||||||||||
A / Two B / Foure C / One D / Three | C | ||||||||||||
21 | A light duty scaffold has 8 planked level howmany working platform shall be consider | ||||||||||||
A / One B / Zero C / Two D / Three | A | ||||||||||||
22 | Base plat shall be used all place except | ||||||||||||
A /Mobile scaffold B/ Light duty scaffold C/ Tower scaffold D/ Heavy duty scaffold | A | ||||||||||||
23 | Soft ground required | ||||||||||||
A / Sill board B / Screw jack C / Base plat D / Level the ground | A | ||||||||||||
24 | All scaffold tubing must have marked | ||||||||||||
A / Bs-1139 B / 10219 C / ASTM-500 D / ASTM-123 | D | ||||||||||||
25 | Load rating of fabricated tubeler scaffold platform | ||||||||||||
A / Light duty B / Special duty C / Medium duty D /All purpus | A | ||||||||||||
26 | SGB type material birdcage scaffold transverse side 1.8mtr longitudinal direction must | ||||||||||||
A/ 1.5 B / 1.8 C / 2.5 D / 2.4 | C | ||||||||||||
27 | When pair of post in position which componet install first | ||||||||||||
A / Outrigger B / Raker C / Tie D / Ledger | D | ||||||||||||
28 | Duration of Reinspection of tag | ||||||||||||
A / 3 Weeks B / 2 Weeks C / 1 Weeks D / 4 Weeks | B | ||||||||||||
29 | What kind of rope use lowering material during dismantle scaffold | ||||||||||||
A / Steel rope B / Knock roll C / Timber Hitch D / Nilon rope | D | ||||||||||||
30 | As per SSH Sole plat (Sill board) not required | ||||||||||||
A / Loose sand ground B/ Concrete ground C/ Asphalt ground D/ Sand Surface | B | ||||||||||||
31 | Where Use Base plate | ||||||||||||
A/ Concrete ground B/ All over except mobile C/ Asphalt ground D/Sand surface | B | ||||||||||||
32 | What type of scaffold is consider as Special scaffold | ||||||||||||
A / 120kg/m2 | B / 290kg/m2 C / 240kg/m2 D / 175kg/m2 | B | |||||||||||
33 | Which type of Scaffold required for piping Equipment work | ||||||||||||
A / Light duty B / Special duty C / Medium duty D / General | B | ||||||||||||
34 | From which height guardrail system required when person protect from fall | ||||||||||||
A / 2.0mtr B / 1.6mtr C / 1.2mtr D / 1.8mtr | D | ||||||||||||
35 | Toprail of guardrail system is inbetween | ||||||||||||
A/ 0.95mtr(38'')-1.15mtr(45'') B/ 0.8mtr(32'')-0.9mtr(35'') | |||||||||||||
C/ 1.0mtr(40'')- 1.20mtr(48'') D/ 0.7mtr(28'')- 0.95mtr(38'') | A | ||||||||||||
36 | Distance from face of wall or steel stucture must not exceed |
|
|||||||||||
A/ 360mm (14'') B/ 250mm(10'') C/ 300mm(12'') d/ 230mm(9'') | A | ||||||||||||
37 | Minimum clear Headroom for scaffolding platform | ||||||||||||
A/ 1.8mtr(6') B/ 3.0mtr(10') C/ 2.0mtr(6.6') D/ 2.5mtr (8') | A | ||||||||||||
38 | Temprary stairways tread depths atleast |
|
|||||||||||
A/ 220mm(9'') B/ 280mm (11'') C/ 215mm (8'') D/ 150mm(6'') | A | ||||||||||||
39 | The distance between bottom rung of ladder to base at least |
|
|||||||||||
A/ 600mm(2ft) b/ 1200mm(4ft) C/ 300mm(1ft) d/ 1500mm(5ft) | |||||||||||||
40 | What type of stamps to be applied on the scaffold tubes | ||||||||||||
A/ BS - 1139 B/ ASTM - 123 C/ BS- 2482 D/ ASTM - 125 | A | ||||||||||||
41 | What is required end of planks more then 25(1'') splited | ||||||||||||
A/ Baded B/ no banding C/ Nailed C/ Tie with wire | A | ||||||||||||
42 | All type connection shall be made by | ||||||||||||
A/ Double coupler B/ Putlog coupler C/ Siwval coupler D/ putlog&siwval | A | ||||||||||||
43 | Tie must connected with always | ||||||||||||
A/ Close node point B/ With outrigger C/ Bracing D/ With min 2 ledgers or posts | D | ||||||||||||
44 | Bracing connection made |
|
degree | ||||||||||
A/ 35 dg to 55dg | B/ 45dg to 55dg C/ 30dg to40 dg | D/ 40dg to 45 dg | A | ||||||||||
45 | The slope of scaffolding platform not exceed | ||||||||||||
A/ 1 vertical to 4 horizontal | B/ 4 horizontal to 1 vertical | A | |||||||||||
C/ 2 vertical to 1 horizontal | D/ 3 horizontal to 2 vertical | ||||||||||||
46 | Wate is the procedure dismantle scaffold | ||||||||||||
A/ Top runner B/ Lift by lift C/ Tie & Transom D/ Any where | B | ||||||||||||
47 | What is the minimum distance from scaffold to 60 kv power line | ||||||||||||
A/ 3 mtr B/ 3.5 mtr C/ 4 mtr D/ 4.5 mtr | C | ||||||||||||
48 | What is the minimum distance of runner joint to the post | ||||||||||||
A/ 300 mm B/ 200 mm C/ 280 mm D/ 350 mm | A | ||||||||||||
49 | Unless Otherwise specified in manufactured instructions of system scaffold braced | ||||||||||||
full height of each |
|
||||||||||||
A/ 10 mtr(33') B/ 15 mtr(45') C/ 8 mtr(8') D/ 6 mtr (21') | A | ||||||||||||
50 | Distance from base to foot tie must be | ||||||||||||
160 mm(6'') min B/ 200 mm(8'') min C/ 160 mm(6'') max D/ 250 mm(10'') max | A | ||||||||||||
51 | When bearer& runner joints must be far from the post maximum | ||||||||||||
A/ 12'' (300mm) B/ 16''(400mm) C/ 6''(150mm) D/ 18''(450mm) | A | ||||||||||||
52 | Scaffolding with one working platform&Eight additional PLF which type of scaffold it is | ||||||||||||
A/ Heavy duty B/ medium duty C/ Light duty D/ Special duty | C | ||||||||||||
53 | SGB Cuplock type Birdcage scaffold transom side 1.8mtr what is the longitudinal side | ||||||||||||
A/ 2.5 mtr B/ 1.8 mtr C/ 1.2 mtr D/ 1.0 mtr | A | ||||||||||||
54 | Heigher then which height of scaffold reviewed by Loss Prevention | ||||||||||||
A/ 6.0 mtr (21ft) | B/ 38 mtr(133ft) C/ 12.2 mtr(40ft) D/ 10 mtr(30ft) | B | |||||||||||
55 | Tube&coupler Medium duty scaffold transverse post spacing 1.2 m what is longitudinal | ||||||||||||
A/ 1.8 mtr B/ 2.4 mtr C/ 1.2 mtr D/ 2.0 mtr | A | ||||||||||||
56 | Medium duty Mobile scaffold Caster wheel dia at least | ||||||||||||
A/ 120 mm (5'') B/ 170 mm (7'') | B | ||||||||||||
57 | What device to install on mobile scaffold caster wheel | ||||||||||||
A/ Wheel lock B/ Screw jack C/ jack plate D/ Base plate | A | ||||||||||||
58 | 50 mm thick OSHA certified planks used on tank bracket scaffold what is the | ||||||||||||
circumferential distance of bracket strap centre | |||||||||||||
A/ 1.5 mtr B/ 3.2 mtr C/ 2.4 mtr D/ 1.8 mtr | C | ||||||||||||
59 | What is the maximum load rating of fabricated tubler frame scaffold | ||||||||||||
A/ 120 kg/m2 B/ 170kg/m2 C/ 240kg/m2 D/ 290kg/m2 | A | ||||||||||||
60 | Bracket scaffold planks overlap minimum | ||||||||||||
A/ In one direction with minimun overlap 230 mm (9'' ) | |||||||||||||
B/ In both direction with minimun overlap 230 mm (9'' ) | |||||||||||||
C/ in both direction with minimun overlap 300 mm (12'') | |||||||||||||
D/ in one direction with minimum overlap 300mm (12'' ) | A | ||||||||||||
61 | Check coupler shall be installed | ||||||||||||
A/ Top of hunger tube&Bottom of Trapaze tube | |||||||||||||
B/ Under of hunger tube & Top of Trapaze tube | |||||||||||||
C/ Under&top of the Beam | A | ||||||||||||
62 | What is the height of first platform in system scaffold | ||||||||||||
A/ 1.5 mtr B/ 2.0 mtr C/ 1.8 mtr D/ 2.5 mtr | B | ||||||||||||
63 | Scaffolding landing &Walkway shall be at least | ||||||||||||
A/ 675 mm(27'')3 planks B/ 600 mm(24'') C/ 760 mm(30'') D/ 1200 mm(47'') | A | ||||||||||||
64 | Under hung scaffold longitudinal side hanger tube spacing more then 1.5 mtr atleast.. | ||||||||||||
A/ one board bearer B/ 3 board bearer C/ 2 board bearer D | / not required | C | |||||||||||
65 | Yellow tag is applied what type of PPE will worn | ||||||||||||
A/Full body harness&anchored | B/ Life line C/ Safety belt&anchored D/Safety belt A | ||||||||||||
66 | Load required for safw anchore point at least | ||||||||||||
A/ 2400 kg(5291lbs) B/ 2000kg(4409lbs) C/ 2260kg(5000lbs) D/ 2600kg(5732lbs | A | ||||||||||||
67 | What is the purpose of use bracing on scaffold | ||||||||||||
A/For rigidity of scaffold B/For inspection C/For looking good D/For contractor Scaffold / A | |||||||||||||
68 | Where are use plan bracing | ||||||||||||
A/ Tower &mobile scaffold B/ Long scaffold C/ Run scaffold D/ Any where | A | ||||||||||||
69 | Which type of scaffold used caster ? | ||||||||||||
A/ Tower scaffold B/ Mobile scaffold C/ System scaffold D/ Any scaffold | B | ||||||||||||
70 | Which type of lanyards suitable to use for scaffold | ||||||||||||
A/ Locking type snaphooks B/ D ring type C/ Only one lock type D/ Any type | A | ||||||||||||
71 | What is the load rating for light duty scaffold | ||||||||||||
A/ 240kg/m2(2.4kn/m2) B/ 120kg/m2(1.2kn/m2) C/250kg/m2(2.5kn/m2) D/270kg/m2 B | |||||||||||||
72 | What type of scaffold for abrasive blasting and cleaning | ||||||||||||
A/ Light duty B/ Special duty C/ medium duty D/ Any type scaffold | C | ||||||||||||
73 | What is the purpose of special duty scaffold | ||||||||||||
A/ To load greater then 240kg/m2 B/Any load C/ To load less then 240kg/m2 | A | ||||||||||||
74 | Where install ledger on the scaffold | ||||||||||||
A/ Lenth side B/ Width side C/ For bracing D/ Any where | A | ||||||||||||
75 | What is the purpose of using screw jack on scaffold | ||||||||||||
A/ Compesate variation of ground B/ For load rating C/ For scaffold stability | A | ||||||||||||
76 | Cantlivered more then 3.0 mtr out side the stucture what type of scaffold | ||||||||||||
A/ Medium duty B/ Light duty C/ Special duty D/ None of above | C | ||||||||||||
77 | Where use spigot | ||||||||||||
A/ System scaffold B/ Tower scaffold C/ Mobile scaffold D/ Any type scaffold | A | ||||||||||||
78 | What is the length of trapaze tube | ||||||||||||
A/ 450mm-600mm B/ 500mm-700mm C/ 200mm-400mm D/ 150mm-300mm | A | ||||||||||||
79 | Guard rail system shall be able to with stand with out failure a force at least | ||||||||||||
A/ 80kg (200pounds) B/ 100kg(220pounds) C/ 110kg(242pounds) D/ 90kg | D | ||||||||||||
80 | What is the length of lanyards | ||||||||||||
A/ 6 Feet(1.8mtr) B/ 6.5Feet(2.0mtr) C/ 8Feet(2.4mtr) D/ 10Feet(3.0mtr) | A | ||||||||||||
81 | Why use snaphooks and D ring in personnel fall arrest systm | ||||||||||||
A/ To prevent rool out B/ To prevent body C/ To hang D/ Any purpose | A | ||||||||||||
82 | Horizontal &Vertical life lines made by | ||||||||||||
A/ 10mm(3/8'') minimum diameter steel rope B/ 11mm minimun diameter mild wire rope | |||||||||||||
C/12mm minimum diameter nylon rope D/8mm minimun diameter polypropelene rope /A | |||||||||||||
83 | Horizontal an unload sag at the center not greater then ? | ||||||||||||
A/ 300mm(12'') B/ 250mm(10'') C/ 200mm(8'') D/ 400mm(16'') | A | ||||||||||||
84 | Toeboard minimum vertical height &thickness at least | ||||||||||||
A/ 200mm(8'')-40mm(1.5'') B/ 150mm(6'')-50mm(2'') C/100mm(4'')-25mm(1'') | |||||||||||||
D/ 120mm(5'')-50mm(2'') | C | ||||||||||||
85 | Toeboard shall be capable load at least ? | ||||||||||||
A/ 23kg(50pounds) B/ 25kg(55pounds) C/ 30kg(66pounds) D/ 20kg(44po) A | |||||||||||||
86 | Where tools material equipment are piled to a point heigher then the top eadge of toe | ||||||||||||
board what kind of protective screen to be used to prevent falling &protect striking worker | |||||||||||||
A/ 18 guage wire with a maximum 13mm mesh | |||||||||||||
B/ 20 guage wire with a maximum 20mm mesh | |||||||||||||
C/ 24 guage wire with a maximum 16 mm mesh | |||||||||||||
D/ 16 guage wire with a maximum 18 mm mesh | A | ||||||||||||
87 | Asafe means of entry and exit shall be provided | ||||||||||||
A/Above or bellow 2ft B/ Above or bellow 4ft C Above or bellow 6ft D/Above or bellow3ft | A | ||||||||||||
88 | What is width and lenth of temporary stairway landing | ||||||||||||
A/ 560mm(22'') wide--760mm(30'')long B/ 760mm(30'')wide--560mm(22'') long | |||||||||||||
C/ 580mm(23'')wide--600mm(24'') long C/ 630mm(25'')wide--760mm(30'') long | A | ||||||||||||
89 | What is the vertical height of temporary stairway | ||||||||||||
A/ 3.7mtr(12ft) B/ 4 mtr(13ft) C/ 4.5 mtr(14ft) D/ 3.5 mtr (11.5ft) | A | ||||||||||||
90 | Temporary stairway shall be installed which degree ? | ||||||||||||
A/ 30- 50 degree B/ 35- 40 degree C/ 40- 50 degree D/ 30- 40 degree | A | ||||||||||||
91 | Temporary stairway riser height at least and maximum how much | ||||||||||||
A/ 6''(150mm)-8''(215mm) B/ 9''(220mm) 11''(280mm) | |||||||||||||
C/ 4''( 100mm)-8'' (215mm) D/ 8''(215mm)- 6'' (150mm) | A | ||||||||||||
92 | Temporary stairway tread depth how much at least and maximum ? | ||||||||||||
A/ 9''-220mm 11''-280mm B/ 6''-150mm 8''-220mm | |||||||||||||
C/ 11''-280mm 8''-220mm D/ 8''-220mm 6''-150mm | A | ||||||||||||
93 | Temporary stairway handrail height shall be ? | ||||||||||||
A/ 940mm 37''-860mm 34'' B/ 950mm 38'' -1150mm 45'' | |||||||||||||
C/ 940mm 37'' -950mm 38'' D/ 860mm 34'' -1150mm 45'' | A | ||||||||||||
94 | Temporary stairway minimum clearance in between hand rail& wall shall be ? | ||||||||||||
A/ 80mm B/ 50mm C/ 100mm D/ 150mm | A | ||||||||||||
95 | Temporary ram and walk way slope not more then | ||||||||||||
A/ 1 V 3 H B/ 1 V 4 H C/ 1 V 1 H D/ 1 V 2 H | A | ||||||||||||
96 | Post spacing is Depend on what | ||||||||||||
A | Length of Scaffolding | ||||||||||||
B | Width of Scaffolding | ||||||||||||
C | Height of Scaffolding | ||||||||||||
D | Load rating of Scaffolding | D | |||||||||||
97 | IF THE LADDER RUNG OR SIDE IS DAMAGE WHAT YOU HAVE TO DO |
||||||||||||
A Repair&Used | B | REMOVED FROM S/ARAMCO | |||||||||||
C | CAN USE IF SAMALL DAMAGE | D | NONE OF ABOVE | ||||||||||
98 | WHAT IS THE DISTANCE BETWEEN THE LEDGER AND TRAPEZE TUBES | ||||||||||||
A | 3 FT | B | 2 FT | ||||||||||
C | 1 FT | D | 4 FT | ||||||||||
99 | WHAT IS THE DISTANCE BETWEEN THE TOEBOARD AND WORKING SURFACE | ||||||||||||
A | 8 MM | B | 5 MM | ||||||||||
C | 6 MM | D | 4 MM | ||||||||||
100 | WHAT IS THE MIN HEIGHT OF TOP RAIL | ||||||||||||
102 | A | 1.15 M (45 INCH) | B | 0.95 M(38 INCH) | |||||||||
C | 0.80 M(32 INCH) | D | 0.90 M (36 INCH) | ||||||||||
103 | SUPERVISOR CAN SIGN LESS THEN WHAT HEIGHT | ||||||||||||
A | 8 M | B | 12.2 M | ||||||||||
C | 6 M | D | 10 M | ||||||||||
104 | WHO WILL INSTAL THE RED TAGE | ||||||||||||
A | SCAFFOLD INSPECTOR | B | SCAFFOLD SUPERVISOR | ||||||||||
C | LPD | D | PERMIT RECIVER | ||||||||||
105 | MED/DUTY TUBE&COUPLER SCAFFOLD IF PLANKS LEVEL 2 HOW MANY WILL BE WORKING PLF | ||||||||||||
A | 3 | B | 5 | ||||||||||
C | 1 | D | 2 | ||||||||||
106 | PLAN BRACING IN MOBILE&TOWER SCAFFOLD SHALL BE INSTALL | ||||||||||||
A | AT THE BASE | B | AT THE TOP | ||||||||||
C | EVERY LIFT | D | BASE &TOPE AND EVERY THIRD LIFT | ||||||||||
107 | IN HANGER TUBE HOW MANY CLAMP FIX AT LEAST | ||||||||||||
A | 3 | B | 4 | ||||||||||
C | 2 TO BE CHECK | D | 5 | ||||||||||
108 | IF THE PLANKS THICKNESS IS 50 MM THE MAXIMUM CIRCUMFERENTIAL DISTANCE BETWEEN | ||||||||||||
A | 3.2 M | B | 1.5 M | ||||||||||
C | 2.7 M | D | 2.4 M | ||||||||||
109 | RAMP OR WALKWAY SHALL HAVE CLEATTS IF THAT IS | ||||||||||||
A | 1 V- 3 H | B | 1 V- 4 H | ||||||||||
C | 1 V-2 H | D | 1 V-1 H | ||||||||||
110 | RAMP OR WALKWAY ABOVE THE HORIZONTAL DEGREES | ||||||||||||
A | 35 D | B | 15 D | ||||||||||
C | 25 D | D | 20 D | ||||||||||
111 | TIES OR GUYS SHALL BE INSTALLED CLOSED TO THE HEIGHT OF | ||||||||||||
A | 3 TIMES THE MINI BASE DIMENSION | B | 2 TIMES | ||||||||||
C | 4 TIMES | D | NON ABOVE | ||||||||||
112 | IF THE GAPE BETWEEN PLANKS 25 MM WHAT TO DO( USE SSH) | ||||||||||||
A COVER WITH PLANKS | B | USE PLY WOOD | |||||||||||
C | NO NEED TO COVER | D | NON ABOVE | ||||||||||
113 | IF SCAFFOLDING IS NOT PASSED OR ALETRING WICH TYPE OF TAG WILL BE USED | ||||||||||||
A | RED TAG | B GREEN TAG | |||||||||||
C | YELLOW TAG | D ANY TAG | |||||||||||
114 | FOR BIRDCAGE SCAFFOLDING INTERIOR LONGITUDINAL ZIG ZAG BRACING IN WICH DEGREES | ||||||||||||
A | 30-35 DG | B | 35-45 DG | ||||||||||
C | 35-55 | D | 30-50 DG | ||||||||||
115 | TEMPORARY RAMP AND WALK WAY SLOPE NOT MORE THEN | ||||||||||||
A | ONE VERTICAL UNIT THREE HORIZANTAL UNITS | A | |||||||||||
B | ONE VERTICAL UNIT FOUR HORIZANTAL UNITS | ||||||||||||
C | ONE VERTICAL UNIT ONE HORIZANTAL UNIT | ||||||||||||
D | ONE VERTICAL UNIT TWO HORIZANTAL UNITS | ||||||||||||
116 | WHAT IS THE NECESSARY WHEN ROOF WORK BEAR THE LOAD | ||||||||||||
A | |||||||||||||
A | REINFORCED | B | PROVIDE SCREWJACK | ||||||||||
C | PROVIDE SOLE BOARD | ||||||||||||
D | PROVIDE BASE PLATE | ||||||||||||
117 | DURING NIGHT TIME AN ELEVATED WORK AREA WHAT TYPE OF LIGHT TO BE USED | ||||||||||||
A | ADEQUATE LIGHT ACCORDING TO SAES-P-123 | ||||||||||||
B | ADEQUATE LIGHT ACCORDING TO BS-1139 | ||||||||||||
C | ADEQUATE LIGHT ACCORDING TO BS-5973 | ||||||||||||
D | ADEQUATE LIGHT ACCORDING TO EN-10219-2 | ||||||||||||
118 | WHAT IS THE SUSTAIED WINDS SPEED ALLOWED TO WORK AN ELEVATED WORK AREA | A | |||||||||||
A | 65 KPH(40MPH) | B | 70 KPH(50MPH) | ||||||||||
C | 50 KPH(30MPH) | D | 80KPH(70MPH) | ||||||||||
119 | FLOATATION RING SHALL BE PROVIDED AT INTERVELS NOT MORE THEN | A | |||||||||||
A | 15 MTR(50 FT) | B | 20MTR(65 FT) | ||||||||||
C | 10 MTR (33 FT) | D | 5 MTR (15 FT) | ||||||||||
120 | WHAT PRECAUTION SHALL BE TAKEN TO PREVENT WORKERS TO HOT SURFACE |
A | |||||||||||
A | BEARIER ,STAND BY MAN WARNING SIGN | ||||||||||||
B | LADDER SIGN BOARD | ||||||||||||
C | COVER THE PIPE | ||||||||||||
D | ANY OF ABOVE |
Everything that happens to us, Happen for a reason, Reason that should make us even closer to Allah (Creator/God) - Education is foremost to shape a person's character in life. - Love is the oldest teaching in the world, for the history of our human existence is through love from our Creator. - Nothing can change a person but the person itself. If you want a happier life, change the way you view the world around you. Take off the negative glasses and put on the positive ones.