RTR PIPING INTERVIEW QUESTIONS
1.Index of Hydro Test?
2.Calibration for Relief valve?
3.Calibration for Manifold?
4.What is the Procedure of Hydro
Test?
5.What is the SAES standard for Bolt
Torquing?
6.How much the time duration for
Gravity Test?
7.What is a Gravity Test?
8.What are the documents of material receiving for
RTR?
9.What is SATIP,SAIC,SAEP,SATR?
10.What is SAES standard for Gravity
test?
11.What is SAES standard for SIS?
12.What is the SATIP for material receiving?
13. What is SAES standard for RTR piping?
14.What is the SAES for Loading &
Unloading of RTR pipes and fittings?
15.What is Punch list?
16.What is NCR?
17.What is the reason of using
Ecentric & Concentric flangs?
18.What is the angle of Taper after
shaving?
19.What is Non metallic gasket?
20.What is PIV?
21.What is the range of Flange
Misalignment,hole to hole,Tilt of flange,Horizontal & Vertical
Misalignment?
22.What is the formula for Minimum
hydro test pressure?
23.What is the Full range of pressure
guage according to SAES?
24.What is RTR?
25.How much curing time for RTR
joints?
26.What is the colour of Resin?
27. Requirement
for pre start-up leak tests?
28.What is Schedule Q?
29.What is MOS?
30. What is SAES standard for oily water,sanitary,fire,utility?
31. What is SAES standard for Plumbing?
32. What is SAES standard for Construction of plant
piping?
33. What is SAES standard for hydro testing?
34.How much the Bedding layer?
35.How much the minimum Treanch
width?
36. What is SAES standard for Non-metallic piping?
37.How much the overlap of Geotextile?
ANSWERS:
11. INDEX
HT
·
scope
·
Purpose
·
Check list
·
Test media
·
Procedure
·
Cleaning
·
Record
·
safety
2.Pressure test relief valve(s) of
adequate capacity set to relieve at 5% above the test pressure shall be
installed unless the test pressure is less than 85% SMYS at which time it can
be set at 10% above the test pressure. Sizing of these relief valves used for
testing shall follow the requirements of API RP 520, Part 1. The relief
valve(s) shall be tested, dated, and tagged within one week prior to the
pressure test for new construction projects, and within one month for
maintenance operations.
Ø REFERENCE:SAES-A-004 PARA:9.5
3. Before employing the pressure
testing manifold in the actual system pressure test, it shall be separately
pressure tested to at least 1.2 times the system test pressure but not less
than the discharge pressure of the pump used for the pressure testing.
Ø REFERENCE:SAES-A-004 PARA/ 5.5.4
4.Identify the maximum test pressure
to be used, as determined by standard.
Identify the type of pipe to be
tested
Maximum aggregate length of pipe to
be tested at one time is 400 feet.
Examine all connections prior to test
to ensure proper tightness.
Determine the pressure rating for all
connected fitting & devices ensure they are rated for maximum test
pressure.
Secure a blind flange or cap suitable
for the system rated pressure on all
Plug all test drain & vent ports
Calibration certificates for
Manifold,Pressure guage,Relief valve
Test certificates validity for relief
valve 1 week
Test certificates validity for
pressure guage 1 month
Fill the water in the system until
water out from vent air bubbles should not come after filling with the help of hydraulic
pump start pressurize the system 10-15 % of test pressure hold on for 15mins if
no leaks again start pressure to 40% hold for 15mins if no leakage 100%
pressurize mention start time of pressurized system, maintain the test duration
and walk through the system if no leaks
after test duration open the vent and drain for releasing the pressure.
5.
Reference:SAES-L-350 PARA: 9.5
6.4 hours.
Ø Reference: SAES-S-020 PARA 5.3.1.2
7. Gravity oily water drainage
systems shall be tested from the catch basin to the first manhole connection
and from manhole to manhole, by filling the line to the top of the catch basin,
or the upper manhole.
Ø SAES-S-020 PARA 5.3.1.2
8. •
Manufacturer's name or trade name, and identification code
•
Pressure/temperature rating
• Nominal
diameter
• Cell
classification in accordance with manufacturing industry
standards
(See item No. A8 in this check list)
• Inspection
and hydrotesting mark
• Date and
shift of manufacture
• SAMS stock
number (if applicable)
• Purchase Order
number
• Flange
designation code
Ø 01-SAMSS-034 Para 13.1
9.SATIP:SAUDI ARAMCO TYPICAL
INSPECTION PLAN
SAIC:SAUDI ARAMCO INSPECTION CHECK LIST
SATR:SAUDI ARAMCO TEST REPORT
SAEP:SAUDI ARAMCO ENGINEERING PROCEDURE
10. SAES-S-020
11. SAES-A-005
12.SAIC-S-070
Revision:5
13.SAES-S-070
14.
SAES-S-070 PARA:5.2
15.It is
guide line meet the minimum quality standards prior to test.
16.Non
conformance report.
17. Ecentric reducer is used at Pump suction to avoid
cavitation. to maintain (BOP) in Rack
Concentric reducer pump
discharge,vertical pipe line.
18.2-6 inch dia 1 ¾ angle,8-24 inch dia 2 1/2 inch angle 26-40 dia 1 ¾
angle further refer Bondstrand guidelines.
19. A “Gasket" material is a term used when
referring to a gasket material that is easily compressed under a low bolt load.
This term has been used to distinguish the difference from a metallic gasket. A
soft gasket material can be selected from a large variety of rubbers and
compressed non-asbestos sheet products, PTFE, flexible graphite and high
temperature sheet.
20.Post indicator valve.
21.
a) Vertical bolt hole offset : ± 2.4 mm
b)
Horizontal bolt hole offset : ± 2.4 mm
c)
Rotational offset : ± 2.4 mm
d)
Flange face tilt across diameter: 0.025 mm per 25 mm (0.001 inch per inch) of
flange outside diameter up to a maximum of 0.672 mm (0.030 inch), and 0.254mm
(0.010 inch) for all flanges with an outside diameter less than 10 inches.
e)
Flange face separation, gasket thickness : ± 1.6 mm
f) Combination of vertical,
horizontal and rotational offset : ± 3.2
Ø Reference:SAES-L-350
PARA: 9.5
22.1.5 (Design Presure)
23.
All gauges shall have a range such that the test pressure is within 30 to 80%
of the full range.
Ø Reference:SAES-A-004 PARA: 8.1.5.3
24.Reinforced Thermosetting Resin.(RTR)
25.2hours Refer:Bondstrand RP-48 Epoxy Adhesive for bonding.
26.White.
27.
New systems after strength tests and prior to initial start-up:
For systems with maximum operating
pressures greater than 6.894 MPa (1000 psi), a leak test with inert gas, followed
by a service test, shall be conducted at the maximum operating pressure of the
piping system. Oil flowlines, trunklines, testlines and water injection lines
are excluded from this requirement.
Ø Reference:SAES-A-004 PARA:5.7.1.1
28.Scedule” Q” stands for QUALITY
minimum requirement as per standards.
29.Method of statement.
30.Oily water SAES-S-020
Sanitary sewer SAES-S-010
Firewater SAES-B-017
Utility water-S-070
31.SAES-S-060
32. SAES-L-350
33.SAES-A-004
34.150mm
35.300mm.
36.SAES-L-610
37.200mm
Prepared & Collection by M.Ajmal Khan.
No comments:
Post a Comment